AN INDUSTRY RESOURCE FOR THE IRON ORE PELLET VALUE CHAIN
AboutContactContribute knowledgeAdvertise ↗
IOPTECHNOLOGY
IRON ORE
PELLETIZING
Process. Equipment. Quality.
Knowledge for the complete value chain.
Find a technical resource ⌕
IRON ORE PELLETIZING

Roll condition & maintenance record

Connect condition observations with operating exposure, measurements and the reason for intervention.

Entries stay in this browser page and are not submitted to IOP. Export CSV or print / save as PDF before leaving. These worksheets organise project evidence; the responsible team defines and approves the requirements.

01 / Asset & exposure

Equipment tag, roll position, part ID, drawing revision and installation date.

Hours and tonnes if known, operating range, moisture and material changes.

Repairs, surface treatment, bearing/drive work and inspection references.

Date, safe-work reference, instruments, measurement points and inspector.

02 / Condition & action

Separate wear, buildup, local damage, surface loss and bearing/drive observations.

Actual values, units, positions, uncertainty and comparison with the approved limit.

Photograph IDs, measurement sheet, sample or inspection report; retain files in the approved system.

Continue, monitor, repair or replace; record the responsible decision and follow-up date.