AN INDUSTRY RESOURCE FOR THE IRON ORE PELLET VALUE CHAIN
AboutContactContribute knowledgeAdvertise ↗
IOPTECHNOLOGY
IRON ORE
PELLETIZING
Process. Equipment. Quality.
Knowledge for the complete value chain.
Find a technical resource ⌕
IRON ORE PELLETIZING

Replacement-roll RFQ worksheet

Define the installed interface, operating duty and acceptance evidence before asking suppliers to quote.

Entries stay in this browser page and are not submitted to IOP. Export CSV or print / save as PDF before leaving. These worksheets organise project evidence; the responsible team defines and approves the requirements.

Read the qualification guide →

01 / Identification & duty

Plant, machine, roll position, quantity and required delivery date.

Drawing numbers, revisions, owner and any unverified survey dimensions.

Ore blend, moisture basis, size limits, throughput range and operating hours.

Wear, buildup, damage, availability or a proposed process change; attach evidence through the approved project channel.

02 / Mechanical interface

Effective length, overall length, nominal diameters, spacing and position-specific features.

Journals, shoulders, coupling, axial location, bearing arrangement and rotation.

Approved tolerances, surface finish, runout and any applicable balancing requirement.

Material/coating specification, batch traceability, inspection method and repairability.

03 / Supply & acceptance

Roll body, shaft, bearings, drive parts, packing, installation support and exclusions.

Hold points, certificates, dimensional report, drawing approval and release responsibility.

Baseline, trial conditions, removal criteria, warranty conditions and evidence to retain.

Record each unresolved item, responsible person and date; do not treat blanks as approved assumptions.